NG/CR-107
Press shop crane 107
Stop use, isolate, escalate to the responsible engineer
Findings (4)
Rope condition meets the discard criteria in the methodology.
Action Take the crane out of service and replace the rope as an assembly, with a certificate for the new rope.
Dropped or swinging load · due 2025-06-28 · ISO 4309 §5.2 · evidence VC-ROPE-DAMAGE
The hook can no longer retain a sling under slack-rope conditions.
Action Fit a correct latch for the hook size before the next lift. Tag the crane out until it is fitted.
Dropped or swinging load · due 2025-06-29 · AS 2550.1 §7.3 · evidence VC-MISSING-LATCH
Corrosion or lack of lubrication is degrading the rope faster than the inspection interval assumes.
Action Clean and dress the rope with the manufacturer's lubricant and shorten the inspection interval until the trend stops.
Dropped or swinging load · due 2025-07-12 · ISO 4309 §5.5
The crane is outside its major inspection interval.
Action Book the major inspection with a competent person and plan the outage it needs.
Loss of design or inspection traceability · due 2025-08-27 · AS 2550.1 §5.5
Photographic record

An illustrated crane hook block with two wire rope falls, a sheave block marked SWL 5 T, a swivel and a hook, hanging in an indoor bay.
- Light surface corrosion or coating breakdown, Several brownish rust stains sit on the steel surfaces of the block, the hook and the left rope, consistent with surface corrosion.
- Hook safety latch missing or defeated, No latch spans the hook throat, which is fully open. A small pivot hole is visible on the hook tip, but no latch is fitted to it.
- Rope or chain damage, Curved wire strands stand proud of the left rope above the rust patch, indicating broken wires.
Assisted by claude-opus-5-5; every observation adjudicated by the inspector before use.
Assessment record
The PDF is generated server-side from this same data, same findings, same wording, same methodology version, plus the photo plate and a sign-off block.