← Equipment register
Lyndale Packing · Boiler house
Boiler house crane 106
Overhead travelling crane / hoist · reassessed every 6 months · criticality A
Current risk
Critical
Stop use, isolate, escalate to the responsible engineer
Open findings
2
highest score 15
Last assessed
2026-07-28
by R. Aldridge
Next due
2027-01-27
On schedule
Findings on the current assessment
from A-1050 · methodology v4.2Broken wires at or beyond discard criteriaR-CR-05Immediate dangerfrom photoS5 × L3 = 15
Rope condition meets the discard criteria in the methodology.
Action Take the crane out of service and replace the rope as an assembly, with a certificate for the new rope.
Dropped or swinging load · due 2026-07-28 · ISO 4309 §5.2
Hook safety latch missing or defeatedR-CR-01Non-conformingfrom photoS4 × L4 = 16
The hook can no longer retain a sling under slack-rope conditions.
Action Fit a correct latch for the hook size before the next lift. Tag the crane out until it is fitted.
Dropped or swinging load · due 2026-07-29 · AS 2550.1 §7.3
Assessment history
2026-07-28 · R. Aldridge
A-1050 · assessed under v4.2 · 1 photo
Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.
Asset record
- Tag
- LY/CR-106
- Asset id
- CR-106
- Class
- Overhead travelling crane / hoist
- Manufacturer
- Steelbridge Lifting
- Model
- G794
- Serial
- 25038-97
- Installed
- 2015-11-01
- Facility
- Lyndale Packing, Cranfield Way
- Area
- Boiler house
- Facility manager
- D. Petrov
- Criticality
- A
What this class is assessed on
- Identification and records4 questions · photo + image analysis
- Hook and block4 questions · photo + image analysis
- Rope, chain and reeving4 questions · photo + image analysis
- Controls, limits and structure5 questions
17 active rules · 9 vision cues.