Plantsight
← Equipment register
Lyndale Packing · Boiler house

Boiler house crane 106

Overhead travelling crane / hoist · reassessed every 6 months · criticality A

Latest report
Current risk
Critical
Stop use, isolate, escalate to the responsible engineer
Open findings
2
highest score 15
Last assessed
2026-07-28
by R. Aldridge
Next due
2027-01-27
On schedule

Findings on the current assessment

from A-1050 · methodology v4.2
Broken wires at or beyond discard criteriaR-CR-05Immediate dangerfrom photoS5 × L3 = 15

Rope condition meets the discard criteria in the methodology.

Action Take the crane out of service and replace the rope as an assembly, with a certificate for the new rope.

Dropped or swinging load · due 2026-07-28 · ISO 4309 §5.2

Hook safety latch missing or defeatedR-CR-01Non-conformingfrom photoS4 × L4 = 16

The hook can no longer retain a sling under slack-rope conditions.

Action Fit a correct latch for the hook size before the next lift. Tag the crane out until it is fitted.

Dropped or swinging load · due 2026-07-29 · AS 2550.1 §7.3

Assessment history

2026-07-28 · R. Aldridge
A-1050 · assessed under v4.2 · 1 photo
2 findingsCriticalReport

Historical assessments keep the methodology version they were completed under. Re-scoring old records against a newer version is an explicit action, never a side effect of publishing.

Asset record

Tag
LY/CR-106
Asset id
CR-106
Class
Overhead travelling crane / hoist
Manufacturer
Steelbridge Lifting
Model
G794
Serial
25038-97
Installed
2015-11-01
Facility
Lyndale Packing, Cranfield Way
Area
Boiler house
Facility manager
D. Petrov
Criticality
A

What this class is assessed on

  • Identification and records
    4 questions · photo + image analysis
  • Hook and block
    4 questions · photo + image analysis
  • Rope, chain and reeving
    4 questions · photo + image analysis
  • Controls, limits and structure
    5 questions

17 active rules · 9 vision cues.